Thought Leadership

A Closer Look at Voltage Park’s Billion Dollar AI Infrastructure

June 18, 2025
Authored by
Nicole Hemsoth Prickett
Head of Industry Relations
A Closer Look at Voltage Park’s Billion Dollar AI Infrastructure
This blog post was written in
2025
and reflects product capabilities at that time. Some information may be outdated.

In a hyperscale cloud market crowded with abstractions and layered virtualization, Voltage Park is staking its claim on the raw simplicity of bare metal infrastructure.

With over a billion dollars invested exclusively in AI hardware, six dedicated AI datacenters, and full-stack designs that reject conventional virtualization in favor of direct hardware access, the specifics reflect not mere preference but strategic choice.

This is a neocloud built on the premise that performance demands exacting control. Rather than hiding resource allocation behind cloud abstractions, Voltage Park provides direct access to GPU nodes deployed on Nvidia HGX H100 clusters, connected through InfiniBand fabrics capable of speeds up to 3.2 terabits per second.

Ethernet networks complement this architecture, ensuring comprehensive high-speed connectivity. Workload management is handled by Kubernetes and Slurm schedulers, providing predictable orchestration of their AI workloads without hidden constraints.

Bare metal, as Voltage Park’s Principal Network Engineer, Drew Pletcher, describes it, is more than marketing. It solves real-world bottlenecks and operational bumps in the road AI customers face with the largest hyperscale cloud providers.

Voltage Park VAST Data Customer Video

Pletcher points to cases of customers who struggled with unpredictability and performance inconsistencies in virtualized hyperscale cloud environments. He cites one customer example involving a rapid expansion from an initial 64 GPUs to over 2,000 GPUs within six to eight months.

That kind of scaling is not so much about raw capacity as it is predictability and insight into performance, all of which are enabled by their unabstracted infrastructure.

Yet, scaling bare metal GPU infrastructure to thousands of nodes brings storage into critical focus. And here is where Pletcher is clear about differentiation.

Pletcher points to benchmarks where VAST exceeded anticipated performance levels. They specifically cite rigorous compliance capabilities required by enterprise customers, including SOC 2, HIPAA, FINRA, and SEC requirements, which VAST reliably meets.

Voltage Park explains their technical evaluation openly, noting that their core requirements were flexibility, performance, redundancy, and multi-tenant security, all provided by VAST’s EBox hardware architecture.

Pletcher explains that workloads on their infrastructure frequently run uninterrupted for weeks, sometimes months. In this case, demand for sustained checkpointing is where VAST shines. He also points to a range of customer data handling preferences, from direct streaming via S3 interfaces to hierarchical data staging.

Across all these scenarios, VAST reliably accommodates intense, continuous data flows without compromise.

But what’s the best metric for Pletcher and team? VAST, is “definitely is not keeping anybody awake at night.”

That sleep metric translates technical reliability into a human, measurable impact.

Infrastructure is fundamentally about predictability, a fact Pletcher openly acknowledges. Predictability, in turn, is directly tied to peace of mind. The ability for engineers and data scientists to rest assured that their workloads will proceed uninterrupted is arguably the most meaningful form of infrastructure performance.

Voltage Park’s embrace of bare-metal systems, coupled with explicit integration of best-in-class storage from VAST, reinforces an infrastructure imperative that prioritizes straightforward excellence over layered obfuscation.

By investing over one billion dollars into dedicated hardware, including Nvidia HGX H100 GPU nodes connected by InfiniBand and Ethernet, managed transparently through Kubernetes and Slurm, and complemented by VAST’s superior storage, Voltage Park provides a template of how infrastructure should be done.

Share this

More from this topic

How Inference Is Forcing a Rethink of AI Infrastructure

How Inference Is Forcing a Rethink of AI Infrastructure

When it comes to large-scale systems for AI, the engineering focus has shifted from training to inference where the performance bottlenecks look very different and where infrastructure...
November 11, 2026
The New Rules of AI Inference Optimization and Future-Proofing

The New Rules of AI Inference Optimization and Future-Proofing

AI infrastructure has always been a moving target, but the pace of change today is challenging even the most experienced system architects. Models are evolving, inference workloads are becoming more…
November 4, 2026
CoreWeave on Building Resilient AI Infrastructure at Massive Scale

CoreWeave on Building Resilient AI Infrastructure at Massive Scale

At CoreWeave’s scale, the definition of a computer is getting bigger. A rack full of GPUs can now behave as a single logical system, and increasingly the same thinking has to extend across rows and…
October 28, 2026

Let’s talk about your data

Whether you want to speak with sales, see a personalized demo, or work through your architecture with a systems engineer, we’re here to help. Choose how you’d like to connect.